바로가기 메뉴
본문 바로가기
푸터 바로가기
TOP

Min, Y., Choi, B.-C., Park, M.-J., & Kim, K. M. (2023). A parallel-machine scheduling problem with an antithetical property to maximize total weighted early work. 4OR, 21, 421–437.

Min, Y., Choi, B.-C., Park, M.-J., & Kim, K. M. (2023). A parallel-machine scheduling problem with an antithetical property to maximize total weighted early work. 4OR, 21, 421–437.

저자

Min, Y., Choi, B.-C., Park, M.-J., & Kim, K. M.

저널 정보

4OR, 21, 421–437

출간연도

2023