바로가기 메뉴
본문 바로가기
푸터 바로가기
TOP

Choi, B.-C., Park, M.-J., & Kim, K. M. (2025). Two-machine permutation flow shop scheduling with generalized due dates to minimize total late work. Journal of Scheduling, Available online.

Choi, B.-C., Park, M.-J., & Kim, K. M. (2025). Two-machine permutation flow shop scheduling with generalized due dates to minimize total late work. Journal of Scheduling, Available online.

저자

Choi, B.-C., Park, M.-J., & Kim, K. M.

저널 정보

Journal of Scheduling, Vol. 28, Issue 6, pp. 563–576

출간연도

2025