바로가기 메뉴
본문 바로가기
푸터 바로가기
TOP

Choi, B.-C., Park, M.-J., Chung, J., Kim, K.-M. (2026). Just-in-time scheduling with battery constraints. Journal of Scheduling. Volume 29, pp. 337–353.

Choi, B.-C., Park, M.-J., Chung, J., Kim, K.-M. (2026). Just-in-time scheduling with battery constraints. Journal of Scheduling. Volume 29, pp. 337–353.

저자

Choi, B.-C., Park, M.-J., Chung, J., Kim, K.-M.

저널 정보

Journal of Scheduling

출간연도

2026