바로가기 메뉴
본문 바로가기
푸터 바로가기
TOP

Choi, B.-C., Park, M.-J. (2025). A preemptive single-machine scheduling problem with a late work criterion and convex resource consumption functions. Optimization letters. Accepted for publication.

Choi, B.-C., Park, M.-J. (2025). A preemptive single-machine scheduling problem with a late work criterion and convex resource consumption functions. Optimization letters. Accepted for publication.

저자

Choi, B.-C., Park, M.-J.

저널 정보

Optimization letters. Accepted for publication.

출간연도

2025

링크