바로가기 메뉴
본문 바로가기
푸터 바로가기
TOP

Choi, B.-C., & Park, M.-J. (2022). Min-max version of single-machine scheduling with generalized due dates under scenario-based uncertainty. Engineering Optimization, 54(10), 1773–1786.

Choi, B.-C., & Park, M.-J. (2022). Min-max version of single-machine scheduling with generalized due dates under scenario-based uncertainty. Engineering Optimization, 54(10), 1773–1786.

저자

Choi, B.-C., & Park, M.-J.

저널 정보

Engineering Optimization, 54(10), 1773–1786

출간연도

2022